Team & People
Marshmallow Challenge Training for Beginners | Team Plans, Results and Round 2 on One Board
Beginner | 4 whiteboard pages · Task board: 5 columns (4 parent tasks, 12 subtasks)
Beginner: No technical terms. Just answer the whiteboard's questions, following the examples, and it takes shape.
Marshmallow Challenge training for two teams: plans, round 1, review and round 2.
Read more Show less
Use it to turn what you change in round 2 into one thing to try at work. Write rules and a height guess, plan and build, review round 1 (what we did, learned, will do next), vote on one change and test it in round 2. Bring materials and a clock yourself, as the board keeps only what teams write. The facilitator times the build and measures height, and each team picks a timekeeper.
Unlike stopping after round 1, you compare height, prototypes and role movement across both rounds in one table, so teams can discuss which change moved the result. Fits 8 to 10 people (two teams of 4 to 5) in about 60 to 90 minutes.
The whiteboard has four A4 pages: aim and teams, plan and build, choose a change, apply at work. The task board has five columns (Prepare, Round 1, Review, Round 2, Try at work) and 4 parent tasks with 3 subtasks each, 16 in all.
Once you have a free account, you can copy this template from the marketplace
Whiteboard preview
Read the whiteboard text as plain text
Marshmallow Challenge Training Board
How to use (all 4 pages): ① Set the aim, teams and rules and guess the height (boards①–③) → ② Plan per team, build and record round 1 (boards④–⑥) → ③ Review round 1 and vote on a round 2 change (boards⑦–⑨) → ④ Compare round 2 and pick one trial and a signal (boards⑩–⑬)
1/4 Set the aim and teams
① Aim, date, people (start here)
- Aim of the training e.g. Learn through movement to try quickly and fix
- Date and time e.g. Week 3 of April, 1:00 to 2:30 p.m. (90 minutes). Rounds 1 and 2 are 18 minutes each
- Participants e.g. 8 new hires who joined in April (ages from late teens to 40s, some mid-career). The facilitator is the team lead who mentors them
- Teams e.g. Team A of 4 and Team B of 4. Mixed by age and previous work
② Check rules, kit and time as a team
| Rule (read) | Checked by the team | |
|---|---|---|
| What to build | e.g. Build a tower that stands on its own, with the marshmallow on top | e.g. Confirmed that both teams let go after the end signal |
| Kit | e.g. 20 sticks of dry spaghetti, 1 m of tape, 1 m of string, 1 marshmallow (per team) | e.g. Confirmed that spaghetti and tape may be cut |
| Time | e.g. Build time is 18 minutes. The facilitator keeps time on a watch | e.g. Each team picks one timekeeper, who calls out when 5 minutes are left |
| How to measure | e.g. Measure in cm from the tabletop to the top of the marshmallow | e.g. The facilitator measures. Confirmed that a collapse counts as 0 cm |
③ Team predictions before you start
- Team A's guessed height e.g. 60 cm. Talk it over, then build in one go
- Team B's guessed height e.g. 40 cm. Build small first and test
- Guess on how plans get decided e.g. Team A will probably be led by the oldest. Team B will probably talk it through together
2/4 Plan and build
④ Team A plan (decide from ② and ③)
- How to fill in: write the form, roles and number of tries before you build
- e.g. Stack triangle towers in 3 tiers and put the marshmallow on top
- e.g. 3 build and 1 keeps time
- e.g. Test with the marshmallow only once, at the end
⑤ Team B plan (decide from ② and ③)
- e.g. Stand one column on a square base and support it with string
- e.g. 2 build, 1 supports, 1 keeps time
- e.g. Place the marshmallow every 3 minutes to test
- e.g. If it falls, shorten the column and rebuild
⑥ Round 1 record (compare teams by row)
| Team A | Team B | Gap between teams | |
|---|---|---|---|
| Height | e.g. 0 cm (collapsed) | e.g. 38 cm | e.g. Team B is 38 cm higher |
| Did it stand? | e.g. Did not stand | e.g. Stood until the end signal | e.g. Team A placed it last and it fell |
| Prototypes | e.g. Once | e.g. 5 times | e.g. Team B rebuilt 4 more times |
| Role movement | e.g. Everyone built, and the timekeeper joined the builders | e.g. Moved according to the roles | e.g. Team B decided roles out loud |
| Use of time | e.g. 12 minutes talking, 6 building | e.g. 1 minute talking, 17 building | e.g. Team A talked longer |
3/4 Choose the change
⑦ Review from the ⑥ record
What we did
- e.g. Team A talked for 12 minutes, then placed the marshmallow for the first time with 6 minutes left and it fell
- e.g. Team B talked for 1 minute and built at once, stood the first one at 3 minutes, tried 5 times and reached 38 cm
What we learned
- e.g. Putting the heavy part on last leaves no time to fix it
- e.g. The team that tried early and small got taller
What to try next
- e.g. In the 5 minutes before building, stand one small tower
- e.g. Decide the timekeeper, supporter and builders first
⑧ Changes for round 2 (2 votes each)
| Change | Impact (◎○△) | Quick to try (◎○△) | Votes | |
|---|---|---|---|---|
| Option 1 | e.g. Test small in the 5 minutes before building | e.g. ◎ | e.g. ◎ | e.g. 9 votes (count the dots by eye) |
| Option 2 | e.g. Decide roles first | e.g. ○ | e.g. ◎ | e.g. 5 votes |
| Option 3 | e.g. Use a triangle base | e.g. ○ | e.g. ○ | e.g. 2 votes |
⑨ Chosen and set aside (from ⑧ votes)
- Chosen, and why e.g. "Test small in the 5 minutes before building". 9 votes, and both impact and speed to try are ◎
- Set aside, and why e.g. "Use a triangle base". 2 votes, and it is about how to build, so it is hard to carry over to how we work at the workplace
- What to measure in round 2 e.g. Height, number of prototypes, minutes until the first one stands
4/4 Apply it at work
⑩ Team A round 2 (testing the ⑨ pick)
- How to fill in: compare on the same items as round 1 (board⑥)
- e.g. Height 45 cm. It stands now, up from 0 cm in round 1
- e.g. Stood a small tower twice in the 5 minutes before building
- e.g. The timekeeper called out 5 minutes left
⑪ Team B round 2 (testing the ⑨ pick)
- e.g. Height 52 cm, 14 cm taller than round 1
- e.g. 7 prototypes, 2 more than round 1
- e.g. First one stood after 2 minutes, 1 minute sooner than round 1
- e.g. It nearly collapsed with 1 minute left, so they re-supported it with tape
⑫ Translate it to work (from ⑩ and ⑪)
- e.g. Testing early and small leaves time to fix
- Morning loading e.g. Test the loading order on one truck first, then load them all
- Delivery routes e.g. Trace a new route on the map once the day before
- When I am unsure e.g. If I am stuck for 10 minutes, I ask the team lead
- Dividing the work e.g. Say the roles out loud before starting
⑬ One trial at work, owner and signal
- One thing to try at work (pick from the ⑫ branches) e.g. In morning loading, test the loading order on one truck first, then load them all
- Owner and deadline e.g. All 8 new hires. Every morning until May 15
- Check date e.g. At the May 15 morning meeting, the team lead asks each person for one minute
- Signal and where to go back e.g. Count every week until May 15. If reloading happens once a week or less, keep going. If 2 to 3 times a week, change the scope of what you try. If 4 times or more, stop and go back to board⑫
Task board contents
Prepare 16 items
Set aims and teams
On page 1 of the board, write the aim, date, people and teams, check the rules, and write each team's height guess. Once these are set, each team can plan right away on page 2. Press Ctrl+F (⌘F on Mac) and type 3/4 to jump to page 3.
Note aim and teams
On the four notes of board①, write the aim, date, participants and teams. Done when the members of Team A and Team B are set.
Check rules and kit
As a team, read the left column of the table on board② and write what you confirmed in the right column. Done when all 4 rows of the right column are filled and the materials are at hand.
Guess team heights
On board③, write each team's guessed height (cm) and a guess about how each team will decide its plan. Done when the 3 notes are filled.
Plan and build
On page 2, each team writes its plan, builds round 1 and records the result in the table. This record is the material for the review on page 3.
Write team plans
Rewrite the notes on boards④ (Team A) and ⑤ (Team B) with the form, roles and number of tries. Done when each team has its 3 items.
Build in 18 minutes
The facilitator keeps 18 minutes on a watch and measures the height after the end signal. Done when the measured number is on the Height row of board⑥.
Compare round 1
In the remaining rows of the table on board⑥, write for each team whether it stood, the number of prototypes, how roles moved and how time was used, and write the gap between teams in the right column. Done when the gap column is filled on all 5 rows.
Choose the change
On page 3, review the round 1 record by what you did, learned and will do next, and narrow the round 2 changes down to one. You will test the chosen change in round 2 on page 4.
Review round 1
In the 3 columns of board⑦, write what you did, learned and will try next, from the record on board⑥. Done when the "What to try next" column has 2 or more ideas for a change.
Vote on candidates
In the table on board⑧, write 3 candidates from the "What to try next" column of ⑦ and mark each ◎○△ for likely to help and quick to try. Each person places 2 circle stamps and you write the counts in the votes column. Done when the counts are written.
Note why you chose
On board⑨, write what you chose and what you set aside, with the reason for each, and decide what to measure in round 2. Done when the 3 notes are filled.
Apply it at work
On page 4, compare the round 2 result with round 1 and decide one thing to try at work. This is the finishing step that takes the training back to the job.
Compare round 2
Test the change you chose on board⑨ and build round 2 in 18 minutes. Then write height, number of prototypes and role movement on boards⑩ (Team A) and ⑪ (Team B), compared with round 1 (board⑥).
Pick one to try
On the 4 branches of board⑫, write examples that turn what you learned in round 2 into work tasks, and pick one. Done when board⑬ has the one to try, the owner and deadline, and the check date.
Keep, change, stop
On the check date, look at the signal on board⑬ and decide to keep going, change or stop. Done when you add the decision and reason to the signal note on board⑬.