Business & Strategy
PDCA Cycle Board for Beginners: Plan, Do, Check, Act One Loop at a Time and Keep the Record
Beginner | 2 whiteboard pages · Task board: 5 columns (4 parent tasks, 12 subtasks)
Beginner: No technical terms. Just answer the whiteboard's questions, following the examples, and it takes shape.
Anyone learning how to run a PDCA cycle for the first time picks one work or study theme and finishes Plan, Do, Check and Act in two weeks with this beginner-friendly PDCA template. The left page of the whiteboard holds a theme and goal frame, a four-step PDCA chain of Plan, Do, Check and Act, a four-quadrant sort for what Check told you, and a six-step 5 Whys that takes the one thing that failed and asks why five times until you reach the root cause. The right page holds a five-step two-week schedule, an improvement history table for loops 1 to 3, and the three points beginners stumble on. The task board has five columns - Plan, Do, Check, Act and Loop done - and starts with 4 parent tasks and 12 subtasks, from choosing the theme through to Act, all not started. If you are unsure how to run PDCA or you stall halfway, narrow it to one theme, follow the worked examples and finish the first loop. From loop 2 the history table stacks up, so you can see later what actually worked.
Once you have a free account, you can copy this template from the marketplace
Whiteboard preview
Read the whiteboard text as plain text
PDCA Cycle Starter
How to use: (1) Set the theme and write the goal as a number → (2) Write the Plan and keep it unchanged for 8 days, from day 2 to day 9 → (3) Read the log and sort what Check told you into the four quadrants → (4) Dig the one thing that failed down to its root cause with the 5 Whys → (5) Write Act in the Act step of the PDCA chain, record it in the history table (board 6, right page) and copy it into the Plan of loop 2
1. The theme you want to improve and the goal for this loop
- Theme you want to improve (only one) e.g. Getting ready in the morning takes too long and I leave home at the last minute every day
- Goal for this loop (write it as a number) e.g. In two weeks, leave home at 8:10 every single day Period: __/__ to __/__ / Someone running it with you: ____
- Numbers before you start (measure first) e.g. Right now it swings between 8:20 and 8:35 Gap: e.g. the average is 8:27 against a goal of 8:10, about 17 minutes late Measured on: __/__ / How: note the time you step out the door on your phone
2. The PDCA cycle (loop 1)
- Plan Decide what, when and how you measure e.g. lay out clothes and bag the night before, at 22:00. Measure the time you leave.
- Do Keep it exactly as planned for 8 days e.g. done on 6 of the 8 days. The 2 misses were nights I got home late from work.
- Check Compare with the numbers from the start e.g. departure now averages 8:14. The spread narrowed from 15 minutes to 8 minutes.
- Act Choose to keep, drop or change it e.g. keep it, and add one condition for late nights: get ready as soon as I get home.
3. Sorting what Check told you
Vertical axis: How it turned out (top = went well / bottom = did not) / Horizontal axis: Which side the cause sits on (left = outside you / right = your side)
- Went well × outside factors Luck or other people carried this one. The same conditions may not hold next time, so just note them and leave this out of Act.
- Went well × your own move This one you can repeat. Send it to keep in Act, write the method as a single line, then copy it into the Plan of loop 2.
- Did not work × outside factors Not something you can change alone. Decide who to ask for help, or replace it with a setup that avoids the situation.
- Did not work × your side The Plan of loop 2 takes exactly one item from here. Dig it down to the root cause with the 5 Whys in (board 4) before you decide the move.
4. 5 Whys - take one item from the bottom right of (board 3) and ask why five times (short version)
- Why 1 Ask why about that one item e.g. missed 2 of 8 days → I got home at 22:00
- Why 2 Write facts only (no guessing) e.g. I went straight to bed → why not do it before bed?
- Why 3 Look at your own method e.g. the plan was one prep at night → why only at night?
- Why 4 Write the reason behind that call e.g. I assumed mornings were impossible → so what about the late days?
- Why 5 Check it with a number and stop e.g. I had 10 free minutes before bed → send the answer to the root cause
- Root cause One sentence that changes the result e.g. there is no backup move for the late nights Take one into the Plan of loop 2
5. How one loop (two weeks) runs
- Day 1 Write the theme and the Plan Set the goal and today's numbers in (board 1), then write three actions or fewer in the Plan step of (board 2).
- Days 2 to 9 Keep doing it Leave the plan untouched and keep going. One line a day: done or not done, plus the number.
- Day 10 Gather the records Line up all 8 days of notes in one place. If a day is missing, leave the gap as it is.
- Days 11 to 12 Sort it out with Check Compare with the numbers from the start and place what you learned in the four quadrants of (board 3). Dig the one that failed five times in (board 4).
- Days 13 to 14 Decide Act and open loop 2 Pick one of keep, drop or change, write it into the history table in (board 6), then copy it into the Plan of loop 2.
6. Improvement history (add one row per loop)
| Plan | Do | Check | Act | |
|---|---|---|---|---|
| Loop 1 (worked example) | e.g. lay out clothes and bag at 22:00 (__/__ to __/__) | e.g. done on 6 of 8 days. The 2 misses were late nights at work | e.g. departure averages 8:14. Spread went from 15 minutes to 8 | e.g. keep it, and add: on late nights get ready as soon as I get home |
| Loop 2 | Copy the Act of loop 1 as it stands. Swap out only one action | Tick the days you did it. No excuses, keep only the facts | Compare the same way as loop 1. Never change the measure midway | Choose exactly one of keep, drop or change |
| Loop 3 | Copy the Act of loop 2 into the Plan of loop 3. Still three actions at most | Keep logging the same way. One line with the days done and the number | Line the three loops up and look for the week where progress stopped | If you reached the goal, graduate and write a new theme in (board 1). If not, change the method, not the theme |
7. Where Plan goes wrong (too ambitious)
- e.g. wrote down 8 actions and all of them stopped within 3 days
- Fix it. Decide that three is the most one two-week loop can carry
- "Try harder" and "stay aware" are not actions
- Attaching an action to an existing routine raises how often you do it
8. Check done right (never end on an impression)
- e.g. it ends at "it went pretty well" and nothing follows from it
- Fix it. Always measure the starting numbers before you begin
- Write the gap as "15-minute spread down to 8-minute spread"
- Keep the reason for the days you missed in the same box
9. The Act rule (copy it into loop 2 on the spot)
- e.g. Act feels decided but the Plan of loop 2 is still blank
- Fix it. Copy Act into the Plan of loop 2 the moment you write it
- Transfer every loop into the history table so it stays on record
- If the numbers do not move after three loops, change the theme
Task board contents
Plan 16 items
Set goal and theme
Groundwork before loop 1. Narrow what you want to improve to a single thing and put the goal in a form you can judge with a number. Without this, Check has nothing to say.
Pick one theme
Write down three things that bother you and keep only the one that will show a result within two weeks. The rest wait for a later loop.
Write a number goal
Instead of "get faster", write "leave home at 8:10", so you can mark the goal met or not met with a yes or no.
Measure the start
Measure today's numbers and write them in (board 1). With nothing to compare against, Check ends as an impression, so always take this first.
Write your Plan
Step 1 of PDCA. Decide what you will do, when you will do it and how you will measure it. Get greedy here and the loop will not close in two weeks.
Keep three actions
List the moves you can think of and cut them down to three or fewer that you can start tomorrow. Write the survivors in the Plan step of (board 2).
Set when to do it
Attach each action to something already in your day, such as every morning or Friday afternoon. An action with no time attached never happens.
Decide how to log
Write in one line what you record, when and where. You will use the same measure from loop 2 onward, so keep the method easy.
Run Do and Check
Steps 2 and 3 of PDCA. Try the plan as written for 8 days, then read the log and confirm the facts. Do not change the plan while it runs.
Try it for 8 days
Keep the Plan you set for the 8 days from day 2 to day 9. Even on days it does not work, leave the plan alone and note what happened in the Do step.
Log one line a day
Write done or not done plus the number for that day. Skip the excuses and keep only facts, and Check will go much faster.
Compare the numbers
Put the number you measured at the start next to the number after two weeks and write the gap in the Check step of (board 2). Write a gap, not an impression.
Act and start loop 2
Step 4 of PDCA. Turn what Check told you into a decision to keep, drop or change, and carry that straight into the Plan of loop 2.
Keep, drop or change
After sorting in (board 3), use the root cause you dug out with the 5 Whys in (board 4) and write down one choice: keep it, drop it or reshape it.
Plan the next loop
Copy what you decided in Act into the Plan of loop 2. Keep the same theme and swap out only one of the actions.
Log it in history
Transfer one loop of Plan, Do, Check and Act into the history table in (board 6). Once three loops sit side by side, the week where progress stopped becomes visible.