WBS for Beginners: Break Work into 3 Levels for a Complete Task List

Project & Development

WBS for Beginners: Break Work into 3 Levels for a Complete Task List

WBS for Beginners walks first-time planners through turning a target deliverable into a three-level work breakdown - major, mid, and minor items - so nothing gets missed in the task list. The whiteboard holds a mind map of the deliverable split into major and mid items, a three-frame sizing guide, a five-step breakdown flow, a five-row WBS table, and a gap-check frame. The task board runs five columns - not split yet, splitting, awaiting estimate, under review, and confirmed - with 4 parent tasks and 12 subtasks, from deciding the deliverable to tabulating the table, all not started. The first question everyone hits is how far to split, and this board's guide is simple: split until one person can finish within a week and someone else can judge whether it's done. Setting the project's purpose and scope is covered by a separate starter template, so this one focuses only on the breakdown once scope is fixed.

0 Likes 0 Copies Author: WeProcess
WBS work breakdown structure project management task listing beginners
Sign up free and use this template

Once you have a free account, you can copy this template from the marketplace

Whiteboard preview

Preview mode WBS for Beginners: Break Work into 3 Levels for a Complete Task List

Whiteboard preview

2. Fits in One Person-Week? 3. Can Someone Else Judge It Done? 4. Signal to Stop Splitting 5. Breakdown Steps (top to bottom, on... 6. WBS Table (number, task, owner, du... 7. Gap Check (before you hand out the... WBS Starter: Work... How to use: (1) P... Deliverable / don... Breakdown rules Gaps and snags Insights and revi... 1. Spread the Del... Deliverable: full new-hire training program 1 Planning e.g. 1.1 Set the goal / 1.2 Confirm audience and headcount 3 Instructor booking e.g. 3.1 Shortlist instructors / 3.2 Lock the schedule 5 Running the day e.g. 5.1 Day-of run sheet / 5.2 Check-in and attendance 7 Budget & orders e.g. 7.1 Get quotes / 7.2 Place orders and pay 2 Materials e.g. 2.1 Outline / 2.2 Slides / 2.3 Exercises 4 Venue & equipment e.g. 4.1 Book the venue / 4.2 Arrange PC & projector 6 Evaluation e.g. 6.1 Build the survey / 6.2 Tally results 8 Invites e.g. 8.1 Send the invite / 8.2 Day-before reminder Size each task so one owner finishes it within 5 business days If it looks like two weeks, it's still too big - split once more e.g. "make slides" -> "draft", "make figures", "apply review notes" If everything finishes in half a day, you've split too far - merge one level back Write it so someone other than the owner can tell whether it's done Pick one thing that proves it - a file, a booking, an approval e.g. "book the venue" -> done when the confirmation email arrives "work on it" or "look into it" can't be judged - rephrase Once 2 and 3 are both met, stop splitting that task Check: can the owner say exactly what to do tomorrow morning e.g. "write 3 exercise questions" has a number and an instant answer Unsure? Split one more level and ask the owner about the size 1. Write one deliverableName the one thing left at the end, as a noun. e.g. a full new-hire training program. This becomes the center of board 1. 2. Split into major itemsSplit the deliverable into 5-8 chunks and number them 1, 2, 3... Make sure they add back up to the deliverable. e.g. planning, materials, instructor booking - the 8 in board 1. 3. Split into mid itemsSplit each major item into 2-4 parts with branch numbers 1.1, 1.2... e.g. materials -> 2.1 outline / 2.2 slides / 2.3 exercises. 4. Split to minor itemsSplit until it meets the guide in boards 2-4, then stop that branch. Keep the depth to three levels - major, mid, minor. 5. Copy into the tableCopy minor items into board 6 in number order with owner, due date, and estimate (person-days). One row per task. e.g. 2.2.1 draft / Hana / 4/22 / 3 person-days. Task (minor item) Owner Due date Estimate (person-... 1.1.1 Goal e.g. Decide the training goal in one sentence e.g. Taro e.g. 4/10 e.g. 0.5 1.2.1 Audience e.g. Confirm audience and headcount e.g. Taro e.g. 4/12 e.g. 0.5 2.2.1 Draft e.g. Draft the slides e.g. Hana e.g. 4/22 e.g. 3 4.1.1 Venue confi... e.g. Book the venue and confirm it e.g. Ken e.g. 4/15 e.g. 1 6.1.1 Survey draft e.g. Draft the survey questions e.g. Hana e.g. 4/25 e.g. 1 Do they add up to the deliverable, with no overlap?e.g. planning + materials + instructor booking + venue and equipment + running the day + evaluation + budget and orders + invites = the full program. Fold duplicates into one. Are the easy-to-forget tasks included?e.g. review and fixes, wait time for approval, printing or shipping, rehearsal. Does every row have an owner and a due date?e.g. if the venue owner isn't set yet, add a row - "decide who by 4/5".
100%

Drag to move, scroll to zoom

Task board contents

Not split yet 16 items

Decide deliverable
Split major items
Split mid and minor
Tabulate and check
Name the deliverable
List what's included
List what's excluded
List 5-8 major items
Remove overlaps
Number the items
Split into mid items
Split to minor items
Check against guide
Copy into WBS table
Add owner and date
Run the gap check

Splitting 0 items

Awaiting estimate 0 items

Under review 0 items

Confirmed 0 items